Resource for construction teams

Compare the bid basis.
Not only the total.

Two commercial plumbing proposals may use different scope boundaries, assumptions, alternates, and document sets. Put those differences beside the number before selecting a path. Published by Masterline Construction as general project-coordination guidance; updated July 28, 2026.

Answer first

Normalize the scope before comparing bids.

Confirm that each proposal uses the same document set, then compare included work, exclusions, allowances, schedule assumptions, qualifications, and unresolved questions.

  1. 01

    Bid basis

    Which drawings, specifications, schedules, and addenda does the proposal reference?

  2. 02

    Included scope

    What work, materials, equipment, coordination, testing, and closeout are stated as included?

  3. 03

    Exclusions

    Which responsibilities are expressly outside the proposal, and who is expected to carry them?

  4. 04

    Allowances and alternates

    Which amounts or choices may change, and what event converts each one into a defined scope?

  5. 05

    Schedule basis

    What milestones, phasing, work hours, access, and sequence assumptions support the proposal?

  6. 06

    Open questions

    Which RFIs, conflicts, owner decisions, or missing documents could change scope or price?

  7. 07

    Commercial terms

    Which proposal validity, insurance, bonding, payment, retainage, and contract assumptions need review?

PROJECT-TEAM INSIGHT

Turn every gap into a visible decision.

A qualification is easier to manage when it names the condition, responsible party, needed decision, and effect on the proposal. Ask the appropriate project authority to resolve technical or contractual requirements.